Paperlane

no. 20 · Monday 23 November 2026

Intercity EV Charging Readiness in Türkiye: A Countrywide Scheduling and Economic Assessment

Taner Cokyasar

math.OC · v2 · 15 pp

Abstract

This paper assesses whether Türkiye's 9,641 public charging stations licensed by the Energy Market Regulatory Authority (EPDK) can support intercity electric vehicle (EV) travel, and at what cost relative to internal combustion engine (ICE) vehicles. A charging scheduling framework based on a directed acyclic graph plans the charging stops of 3 million synthetic intercity trips on a 55,236-link highway network built from OpenStreetMap. Virtually all trips can be completed with the existing stations under both 10–100% and 20–80% state-of-charge windows; the 0.3% feasibility that a 20–80% window can produce arises only when trips must also start within the window, not from gaps in the network. Capacity, not coverage, is the binding constraint: with plug counts calibrated to EPDK socket statistics, uncoordinated charging builds long queues at the stations where trips converge, whereas coordinating charging times with reservations nearly eliminates waiting at today's adoption level of about 3%. In the 350 kW scenario at 3% adoption, the EV is 49.8% cheaper than the ICE vehicle in operating costs (energy, refueling, detour, and charging time) and 7.4% cheaper in total cost of ownership, an advantage that holds as long as the EV costs at most about 9% more than a comparable ICE vehicle. Adding the cost of charging infrastructure makes the EV more expensive at low adoption with high-power chargers and cheaper as adoption grows.

comments
15 pages, 5 figures, 6 tables
fields
Optimization and Control